Download Print this page

Preliminary Operations; Preparations And Choice Of Position; Checking Spa Integrity - treesse Phantom BA06 Installation Manual

Hide thumbs Also See for Phantom BA06:

Advertisement

Preliminary operations

PREPARATIONS AND CHOICE
1
OF POSITION
The pre-installation sheet supplied at the time
of purchase provides all the information neces-
sary for a correct preparation of the installation
environments.
Before installing the spa, check that everything has
been prepared. Find below a quick checklist, for com-
plete information always refer to the pre-installation sheet.
Check that:
• A platform or a recess (in the case of recessed installa-
tions) of reinforced concrete, with a minimum thickness
of 3.9 in, has been created, perfectly flat and suitable for
supporting the weight of the spa and the people within.
• Ø5.9 in vents have been installed to ensure proper
ventilation of the technical compartment
• Drainage grating around the perimeter has been in-
stalled to help preserve the equipment and the struc-
ture (even for indoor installations).
• Non-slip flooring has been installed in the area around
the spa.
• For a recessed installation, a technical inspection port
measuring at least 19.6 in wide has been prepared on
all sides of the spa.
• The connections to the water supply and electrical grid
have been made in compliance with current regulations
in force in the country of installation.
• A drain, a gate valve (to shut off the supply water) and
drain valves have been installed (to empty the bathtub
at the end of the season).
• A water softener has been installed (upstream of the
spa) if the water has a high degree of hardness.
• For outdoor recessed versions, the walls have been
insulated to protect against the cold.
2

CHECKING SPA INTEGRITY

After having removed the spa from the packing, check its integrity.
Check:
• That there is no visible structural damage.
• That there are no cracks in the surface of the spa or in the outer covering (cracks due to incorrect transport or sup-
port are not covered by the warranty).
• The correct position of the sleeves and pipes.
• That any ties are not loosened.
If you notice any anomalies, do not proceed with the installation but rather promptly contact the Manufacturer.
EN
More information
OUTDOOR INSTALLATION
Preparations: in cold areas, to avoid possible damage
due to freezing, it is recommended to provide valves
for the total drainage of the pipes, to be positioned at
their lowest point.
To run the pipes and electric cables from the main
electrical panel to the spa underground ducts must be
used and adequately protected against freezing by us-
ing insulation. It is also recommended to add drainage
points in them to prevent standing water.
Choice of
position: take into account the proximity
of trees or hedges, and note that debris (e.g., leaves)
can cause damage to the equipment over time that is
not covered by warranty and make maintenance more
expensive and frequent. It is also recommended to
always install flooring around the spa, possibly anti-slip.
INDOOR INSTALLATION
Preparations: in the area used to access the spa it is
recommended to install anti-slip flooring. The evapora-
tion of water in the spa in the presence of high internal
temperatures can generate very high levels of humidity
in the environment.
To avoid this problem, provide good natural or forced
ventilation in the installation environment and, if nec-
essary, a dehumidification system. Damage caused by
this phenomenon is not covered by the manufacturer
warranty.
Choice of
position: Always take into account the size
of the spa: narrow passages, doors and steps can be an
obstacle to its transport to the desired place.
8
Phantom
spa

Advertisement

loading
Need help?

Need help?

Do you have a question about the Phantom BA06 and is the answer not in the manual?

This manual is also suitable for:

Phantom ba04