Page 1
Phantom BA06 - BA04 Pre-installation manual READ AND FOLLOW ALL INSTRUCTIONS...
Page 2
Proper preparation of the premises and systems will ensure a safe and rapid installation of the spa. For this reason we advise you to read this manual carefully and to carefully follow all the information contained herein.
Contents MEASUREMENTS AND TECHNICAL SPECIFICATIONS ___________ 4 TEMPORARY POSITIONING ______________________________________________________________________ 6 WHAT PREPARATIONS ARE REQUIRED? _______________________ 7 PREPARATION OF CONNECTION TO AN OPTIONAL EXTERNAL EXCHANGER (NOT SUPPLIED) _________ 8 IDENTIFICATION OF THE INSTALLATION SITE __________________ 9 OUTDOOR INSTALLATION _______________________________________________________________________ 9 INDOOR INSTALLATION _________________________________________________________________________ 9 FREESTANDING INSTALLATIONS _________________________________________________________________ 10 PREPARATION OF THE INSTALLATION SITE ____________________ 10...
Page 4
Pre-Installation Phantom BA06 PHANTOM BA06 MEASUREMENTS AND TECHNICAL SPECIFICATIONS spa dimensions 92.52 x 92.52 x 38.58 in maximum water 555 gal content Packaging Freestanding Recessed Drain Pipe insulation The manufacturer suggests a mini- weight 5,622 lb mum load of 95.23 lb/ft...
Page 5
Pre-Installation Phantom BA04 PHANTOM BA04 MEASUREMENTS AND TECHNICAL SPECIFICATIONS spa dimensions 92.52 x 92.52 x 38.58 in maximum water 555 gal content Packaging Freestanding Recessed Drain Insulation for pipes The manufacturer suggests a mini- weight 5,622 lb mum load of 95.23 lb/ft with water weight 992 lb...
Pre-Installation Phantom BA06-BA04 80°C The spa works efficiently and safely if it is installed cor- 176°F rectly and in compliance with the regulations in force in the country of use. This pre-installation guide provides information for a proper preparation of the environments and the plumb- ing and electrical connections.
Pre-Installation Phantom BA06-BA04 WHAT PREPARATIONS ARE REQUIRED? To be installed, the spa requires: Identification of the installation site. Room for the electrical con- Preparation of the installation site. nections Preparation of the plumbing. Preparation of the electrical system. a possible external heat exchanger (optional), see next page for details.
Treesse spas are built to be positioned outdoors. If you install the spa inside, remember that it must be able to be easily inspected or moved for any ordinary and...
Pre-Installation Phantom BA06-BA04 PREPARATION OF THE INSTALLATION SITE Before preparing the supporting surface, see the sections on the plumbing and electrical con- Prepare: nections for positioning the connections cor- rectly. A drainage grating around the perimeter to help • FREESTANDING INSTALLATIONS preserve the equipment and the structure (even for indoor installations).
Pre-Installation Phantom BA06-BA04 RECESSED INSTALLATIONS tures reached in the country of installation. For the configuration of the water and electrical As a base, create a reinforced concrete recess having a connections see the pertinent section on page12 thickness of at least 3.9 in, perfectly flat and able to sup- and 16.
Pre-Installation Phantom BA06-BA04 PLUMBING PREPARATIONS The water connection must be dedicated exclusively to the spa (it is not possible to connect other equipment to the same connection) and carried out with new and never used hoses and couplings. It is recommended to use ONLY tap water as it guarantees microbiological purity and absence of metallic particles (not blocked by the filter) or organic substances.
Pre-Installation Phantom BA06-BA04 More information TAP WATER AND WELL WATER To ensure maximum hygiene and durability of the spa it is essential to pay close attention to the quality of the water that will be used to fill it. It is important that the water used be drinkable. It is always advisable not to use well water because it may be very hard, rich in metals like iron and manganese, and have bacterial loads.
Pre-Installation Phantom BA06-BA04 CHARACTERISTICS OF THE WATER SUPPLY OPTIMAL VALUES PARAMETER VALUES ABOVE OR BELOW CAN... between ... Refer to the specific regulations ...cause problems related to the safety and well-being of POTABILITY of the country of use users ...cause build-up that over time can cause damage to the walls of the spa, the pipes, the filter system, as well as the heating unit and pumps.
Page 15
Pre-Installation Phantom BA06-BA04 EXAMPLE OF PRE-INSTALLATION PLUMBING FOR A SPA Connection to the spa using the 1/2 inch female hose provided. Connect the drain of the floor spa. The plumber If the spa is installed outdoors provide an adequate thermal insula- is responsible for the choice and type of materials tion of the pipes.
Pre-Installation Phantom BA06-BA04 ELECTRICAL PREPARATIONS The Treesse spas are built in compliance with UL laws (XXXXXXXX) and are tested during production to ensure the safety of the installer and user. The connection must be made by an experienced, qualified electrician.
Page 17
Pre-Installation Phantom BA06-BA04 Local regulations prohibit any elec- trical installation (plug sockets, switches, lamps, etc.) in the area surrounding the SPA for a distance of at least 23.6 in and a height of 90.5 in. LEGEND C Electrical connection (measurements in inches)
Page 18
Pre-Installation Phantom BA06-BA04 ELECTRICAL DIAGRAM ELECTRICAL * OPTIONAL SPLITTER PN DIAGRAM J43 TO J13 (BLOWER ON 22934 MAY BE REQUIRED IF J14) IN SETUPS 3, 5, 9, TWO DIFFERENT THINGS NEED TO BE CONNECTED AT J33 11, 12, 17, 18 CLIM8ZONE ™...
Page 19
Notes Pre-Installation Notes Phantom BA06-BA04 Maximum care has been paid to guarantee the accuracy of this manual. The Manufacturer reserves the right to modify the equipment or the documentation at any time, without notice. Therefore there might be small differences between this manual and the product you have received: we apologise in advance for any inconvenience.
Page 20
www.gruppotreesse.it GRUPPO TRE S s.p.a. 01036 Nepi (VT) - Italy S.S. Cassia km. 36.400 Settevene industrial area tel. (+39) 0761 527242 fax (+39) 0761 527223 info@gruppotres.it...
Need help?
Do you have a question about the Phantom BA06 and is the answer not in the manual?
Questions and answers