Failback Join Operation
Go to the SAR page in the acting primary (original secondary) box and click on the
"Failback Join" button. After this the Role in the original Primary box changes to
secondary.
Failback Join operation can be done only in the acting primary (original secondary) box.
Before Failback join Operation in Primary (Original Secondary) Box.
218
StorTrends/ManageTrends (version 2.7) Web Interface User's Guide for the StorTrends 2200 Storage Appliance
Note: