Unpack the pump

Unpack feed pump or ILD pump
Step
1
2
ÄKTA process Unpacking Instructions 29605009 AD
WARNING
Heavy object. Because of the significant weight of the product,
great care must be taken not to cause squeezing or crushing inju-
ries during movement.
Action
Place the crate on a hard, horizontal floor with at least 300 cm of free space
on the ramp side of the crate. The ramp side is marked with guides for the
ramp supports.
a. Use a flat-head screwdriver to lever off and remove the clamps on the
ramp panel of the crate.
b. Leave the two middle clamps until last to prevent the panel from tipping.
25