cytiva AKTA process Unpacking Instructions Manual page 24

Table of Contents

Advertisement

Step
6
7
24
Action
The three cables that are attached to the operator console must be
connected to the connectors at the bottom of the electrical cabinet.
Connect the CBL-111 cable to the SDL 4 connector for all signal connec-
tions to and from the touchscreen monitor and the keyboard (DVI signal
and USB connection).
Connect the CBL-110 cable to the Monitor Power connector for the
power supply to the touchscreen monitor.
Connect the CBL-34 cable to E-STOP 3 connector for the E-stop and
Reset signals.
Fix the cables neatly together with the existing cables underneath the elec-
trical cabinet using cable ties.
ÄKTA process Unpacking Instructions 29605009 AD

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA process and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Akta process sAkta process l

Table of Contents