The system consist of ÄKTA start instrument, a fraction collector and a PC with UNICORN™ start software. For a detailed description of the system, refer to ÄKTA start System Cue Card and ÄKTA start Operating Instructions. WARNING Read ÄKTA start Operating Instructions before using the instrument. cytiva.com...
Interval Maintenance action Interval Maintenance action Daily Clean the valves (at least with DM Perform Zero offset for the Pressure or when water) to avoid salt crystal formation sensor. required after every run or at the end of the Replace the inlet filters. day, or when the instrument will be left idle for several days.
Page 4
Operation from the Instrument Instruction Display 1. Immerse the buffer inlet tubing in DM water or the buffer of choice. Perform the following operations to run Pump wash. 2. Disconnect the column from the flow path and reconnect the tubing with a Union connector. 3.
Page 5
Operation from UNICORN start • Routine maintenance • Preparing the system for storage Perform the following operations to run System • Removing/preventing contamination (bacterial cleaning. growth) in the flow path UNICORN start • Preventing carryover of buffers/samples Cleaning solutions System control •...
Storage 4. Run for 3 to 5 minutes. If the column is not going to be used for a couple of Operation from the Instrument days or longer, store the column. Display Instruction Perform the following operations to clean the •...
Page 7
Cleaning solutions 3. In the Pressure sensor screen, tap Zero offset then tap OK if there is no back pressure in the • 1 M NaOH system. • DM water Note: Make sure that the Pump is OFF before Note: Before cleaning the Conductivity cell, disconnecting the tubing.
Page 8
Note: We recommend to keep the instrument On to avoid Conductivity flow cell calibration condensation in a cold room. Prerequisites For more details on the procedure for turn on/off the UV LED, refer to ÄKTA start Operating Instructions. Calibration solution: 1.0 M NaCl or 100 mS/cm Note: Make sure that the UV flow cell is assembled tightly, conductivity standard solution.
Page 9
Checklist Acceptance criteria Make sure that all the modules Pressure • Time Activity Check Aproved sensor, Pump, UV and Conductivity are (min) interval calibrated. • Set the conductivity reference temperature to Wash valve Pump wash Mobile 20°C. position phase out through •...
Page 10
Time Activity Check Aproved Time Activity Check Aproved (min) interval (min) interval Start gradient, 50% B Gradient level 45 - 55% B 0-100% B in 0% B (re- 10 min, start equilibrate) fractionation/ Check all collection connec-tions leakage Weigh 0.8 - 1.2 g for leakage fractionation fraction no 2,...
7. Wash the Bowl under a water tap. Use a mild Replace the tubing and connectors detergent if required, and rinse thoroughly with water. Maintenance interval 8. Wipe the surface with a damp cloth. Wipe off Replace tubing and connectors when the tubing is stains using water.
Servicing, depending on whether the instrument is courses are available and can be arranged by going to be serviced on site or returned for service, contacting your local Cytiva office. respectively. Copy the form you need from Operating The information given in the Cue Cards suggests...
Page 13
User documentation for ÄKTA start Documentation Book Online Operating Instructions • • Maintenance Manual • • System Cue Card • • • Maintenance Cue Card • • • UNICORN start User • • Manual UNICORN start Online • Help Display Help •...
Page 14
Cytiva and the Drop logo are trademarks of Global Life Sciences IP Holdco LLC or an affiliate. ÄKTA and UNICORN are trademarks of Global Life Sciences Solutions USA LLC or an affiliate doing business as Cytiva. Decon is a trademark of Decon Laboratories Ltd.
Need help?
Do you have a question about the AKTA start and is the answer not in the manual?
Questions and answers