Omron NS Manual page 258

Ns-series designer
Hide thumbs Also See for NS:
Table of Contents

Advertisement

Section 10 Transferring Data
NS-Designer Operation Manual
3.
Click the Comms. Method Button and set the communications method. For details, refer to 10-1-2
Communications Settings for NS-Designer.
4.
Click the Connect Button. The computer will be connected to the PT.
5.
Click the
which to save the uploading data, and click the Save Button.
6.
A confirmation dialog box will be displayed. Click the OK Button. Uploading will start.
The transfer progress will be displayed at the PT and in the Screen Data Transfer Dialog Box.
7.
When an automatic reset after transfer has not been set, the following dialog box will be displayed
at the computer when the data transfer is finished. The PT must be restarted to operate the
screens that have been transferred. Click the Yes Button to restart the PT. Click the No Button to
continue downloading data.
Even if the No Button is clicked, the following confirmation dialog box to restart the PT will appear
after Screen Data Transfer Dialog Box is closed. If the Yes Button is clicked, the PT will be re-
started. If the No Button is clicked, you will have to restart the PT manually. If the Cancel Button is
clicked, the Screen Data Transfer Dialog Box will return.
Button. The Save as Dialog Box will be displayed. Specify the project name under
10-22
10-1 Transferring Data to the PT

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ns-nsdc1-v6

Table of Contents