Alignment Procedure - Omron F3SP-U4P-TGR User Manual

Safety control unit safety level 4
Hide thumbs Also See for F3SP-U4P-TGR:
Table of Contents

Advertisement

F3SP-U4P-TGR
6

ALIGNMENT PROCEDURE.

After having carried out the correct mechanical assembly and the correct
connections as described in the previous paragraphs, it is necessary to
align the light curtains. Follow the operating guide as follows:
• Turn off the power supplying the control unit.
• Open the test contact.
• Power the control unit.
• Align the light curtain by observing the LEDs on the control unit: If
the alignment of the light curtain 1 is correct, the LED 1 and 2 are
turned on. If the alignment of the light curtain 2 is correct, the LED 3
and 4 are turned on.
• After the alignment, turn off the power supplying the control unit,
close the test contact and power the control unit again.
• Wait for the control unit to carry out the initial tests.
• At the end of this operation, the unit indicates the right alignment
with the guard led green on.
• Carry out all the checks described in the final checks and in the
routine maintenance operations.
During aligning operations or normal working, check that the light curtains
connected to the same or other units do not interfere with each other.
Modifying their mutual position for instance by positioning emitter on the other
receiver side.
User's manual
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents