Operation Level ( ) - Omron E5AR-T User Manual

Programmable digital controller
Hide thumbs Also See for E5AR-T:
Table of Contents

Advertisement

Section 8 Parameters

8.3 Operation Level ( )

Display this level to operate the control system. The SP can be set and the PV monitored in this level.
● Level Changes at Startup Up To Operation Level
● Parameter Changes within Operation Level
8-6
Power ON
Power ON
Program
Operation
Setting
Level
Level
L key
less than 1 s
L key less
than 1 s
Approximation
Time Signal
Setting
Setting
Level
l.tec
Level
L key
less than 1 s
Operation Level
CH
25.0
PV/Manual MV
(Position-proportional control
0.0
models: PV/Valve Opening)*1
manu
M
CH
25.0
PV, SP,
0.0
Program No., Segement No.
01.01
M
CH
prg
PRG: Program No.
1 to 32
1
M
CH
hold
HOLD: Hold
OFF/ON
off
M
CH
adV
ADV: Advance
off
OFF/ON
M
CH
back
BACK: Back
OFF/ON
off
M
CH
stbm
STBM: Remaining Standby
Time Monitor
0.00
M
CH
prg.t
PRG.T: Elapsed Program
0.00
Time Monitor
M
Adjustment
Adjustment 2
Level
Level
l.adj
L key
L key
less than 1 s
less than 1 s
Alarm Set
PID Setting
Setting
Level
l.pid
Level
L key
L key
less than 1 s
less than 1 s
Control in progress
CH
seg.t
SEG.T: Elapsed Segment Time
0.00
Monitor
M
CH
seg.r
SEG.R: Remaining Segment
Time Monitor
M
CH
rptm
RPTM: Program Execution
Repetition Monitor
0
M
CH
rsp
RSP: Remote SP Monitor
0.0
M
CH
o
O: MV Monitor (Heating)
0.0
M
CH
c-o
C-O: MV Monitor (Cooling)
0.0
M
CH
V-m
V-M: Valve Opening Monitor
0.0
M
CH
r-r
R-R: Run/Reset
RUN/RST
rst
M
CH
A-M: Auto/Manual
a-m
AUTO/MANU
auto
M
1 In manual mode
l.ad2
L key less
than 1 s
l.alm

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5er-t

Table of Contents