Adjusting Programs; Changing The Sp; Changing The Time - Omron E5AR-T User Manual

Programmable digital controller
Hide thumbs Also See for E5AR-T:
Table of Contents

Advertisement

4.15 Adjusting Programs

■ Changing the SP

■ Changing the Time

The temperature vector will change if the program is changed during
operation when step time operation is used. This section describes the
vector changes.
If the SP is changed during a segment, the present SP will move in a
straight line with the changed SP as the target point.
SP
Before change
After change
Point of change
Segment N
If the time is changed during a segment, the slope of the line along
which the present SP moves will change because the time taken to
reach the target will change.
SP
Before change
After change
Point of
change
Segment N
Segment N
If the segment time after the change is shorter than the elapsed
segment time, the program will immediately move to the next segment.

4.15 Adjusting Programs

Segment N+1
Segment N + 1
Segment N + 1
Time
Time
4-51

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5er-t

Table of Contents