Ramp Rise Rate Setup Program - Omron E5AK PROGRAMMABLE TYPE User Manual

Digital controller (programmable type)
Hide thumbs Also See for E5AK PROGRAMMABLE TYPE:
Table of Contents

Advertisement

4.3 Ramp Rise Rate Setup Program

Chapter 3 described programs that used the "time setup method." Pro-
grams were executed using a combination of SPs and step time values.
The E5AK-T also supports the "ramp rise rate setup method." By this
method, programs are executed using three program elements: "target
SP", "rate of rise" and "soak time."
To select a ramp rise rate program, set the "Step time/rate of rise pro-
gramming" parameter (expansion mode) to "
Target SP
Step
Ramp step
Set each of the above program elements in the "target SP 0 to 7", "rate
of rise 0 to 7" and "soak time 0 to 7" parameters.
In a ramp rise rate program, parameters are set to two steps as shown
in the figure above. The following figure shows the relationship be-
tween the program and parameters.
Target SP 1
Soak time 0
Target SP 0
Target SP 2
Step
0
Target SP 0
Rate of rise 0
Parameter
Soak time 0

4.3 Ramp Rise Rate Setup Program

: rate of rise."
Soak time
Rate of rise
Time unit of ramp rate
N
N+1
Soak step
Soak time 1
1
2
3
Target SP 1
Rate of rise 1
Soak time 1
Soak time 2
4
5
Target SP 2
Rate of rise 2
Soak time 2
4--9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E5AK PROGRAMMABLE TYPE and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

E5ak-t

Table of Contents