Cabinet Installation and Grounding
Follow these instructions to install the PPC system, and pay attention to the ground
pin which should be connected to the earth/ground. PPC system should give the best
performance for EMI optimum EMI immunity, ESD immunity, surge immunity, and
system isolation. If the PPC system is embedded in the cabinet, the PPC system's
ground, cabinet's ground and earth/ground should be connected together.
1.
Install the PPC system into the cabinet.
Step A: Connect the cabinet to the earth/ground.
Step B: Embed null PPC system into the cabinet without any I/O cable and power.