Power Modules; Station Modules - Hunter ICC2 Owner's Manual

Modular residential and commercial irrigation controller
Hide thumbs Also See for ICC2:
Table of Contents

Advertisement

Installing Modules
POWER MODULE
1.
Locking Lever: Flip up to remove or install the module, or
flip down to lock the module into place.
2.
C (Common Wire Connection): Makes common
connection for P/MV and/or station wiring.
3.
P/MV (Pump/Master Valve Connection): Up to 0.56 A
for Master Valve or Pump Start Relay activation.
4.
Flow sensor input (future).
5.
Solar Sync or Clik Sensor input.
6.
Test 24 VAC (always on): Use to test and locate
valve wires.
7.
REM (Remote Control Input): Prewired to Hunter
SmartPort connector for use with Hunter ROAM
and/or ROAM XL Remotes.
8.
24 VAC (x 2) Transformer Connection: Connects 24 VAC
yellow wires from the transformer. Also used to power
Hunter sensor modules and receivers.
9.
GND: Connects green safety ground wire from the
transformer.
10.
Ribbon Cable Connection: Connects the controller to
the control panel.
11.
Installation Tabs: Tip the module and insert these tabs
into the station output slot.

STATION MODULES

1.
Locking Lever: Flip up to remove or install the module,
or flip down to lock the module into place.
2.
C (Common Wire Connection): Makes common
connections for station wiring.
3.
Station Terminals: Numbered connections for each
24 VAC station output wire to valves. ICM-400 has
four, ICM-800 has eight, and ICM-2200 has 22 station
output terminals.
4.
Installation Tabs: Tip the module and insert these tabs
into the station output slot.
16
hunter.help/ICC2EM

Advertisement

Table of Contents
loading

This manual is also suitable for:

I2c-800-plI2c-800-mI2c-800-ssI2c-800-pp

Table of Contents