Installation
Installing Extension and Nozzle on Meter
26c
26a
26b
ti12062a
ti12063a
F
. 6
IG
1. Thread the fitting (26c) onto the extension (26a).
2. Thread extension fitting (26c) into meter outlet at
least three full turns. (F
NOTICE
Do not use a twist/lock or manual shut-off nozzle. You
must use an automatic nozzle on the meter or the
meter could be damaged.
3. Thread new nozzle (26b) onto extension. With an
open-end, adjustable wrench, tighten it firmly.
Only tighten nozzle with the wrench on the flats of
the nozzle bushing. Do not disassembly the
bushing from the nozzle. Disassembly will affect
the performance of the nozzle.
6
26c
26a
26b
. 6).
IG
B
F
. 7
IG
4. Open all dispense position shut-off valves (B, F
and start the pump to pressurize the system. See
Operation, (ME5 Meters - page 11; PE5 Meters -
page 20), for proper operation of meter.
•
To ensure dispensing accuracy, purge all air
from the fluid lines and dispense valve before
you use it.
•
Set the system flow to the desired flow rate,
which is typically 1.5 gpm. Do not exceed a
5-gpm flow rate.
ti12081a
. 7)
IG
312668B