Graco ME5 Instructions Manual page 5

Electronic metered dispense valves
Table of Contents

Advertisement

4.
a. Place the hose end (with no dispense valve
connected) into a container for waste oil.
b. Secure the hose in the container so it will not
come out during flushing.
c. If you have multiple dispense positions, first
flush the dispense position farthest from the
pump, then work your way toward the pump.
B
F
. 4
IG
5. Slowly open the shut–off valve (B, F
pense position. Flush out a sufficient amount of oil
to ensure that the entire system is clean. Close the
valve.
6. Repeat step 5 at all other dispense positions.
312668B
Connecting Hose to Meter
F
1. Follow the Pressure Relief Procedure, page 4.
2. Slide the swivel cover (4) onto the hose, small end
3. Apply thread sealant to the male threads of the hose
ti12081a
. 4) at the dis-
IG
hose
fitting
3
. 5
IG
first, before connecting hose fitting to swivel (3) (F
5).
fitting. Thread the hose fitting into the swivel (3) and
tighten firmly (F
. 5).
IG
Make sure you let sealant cure to the manufac-
turer's recommendations before you let fluid into
the system.
Installation
4
ti0269
.
IG
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pe5255751256215255277265216

Table of Contents