Multiple Single Flat Plate For Top/Bottom Segment Field Assembly - York MCH CRAH Installation And Assembly Manual

Air handling units
Hide thumbs Also See for MCH CRAH:
Table of Contents

Advertisement

Form CRAH102.20-N1
Issue date: 03/11/2024
Ensure that the neoprene gasket is
correctly installed on the bottom tier.
Figure 33: Neoprene gasket on bottom tier
Ensure that all of the electrical or
control wires or tubes in both tiers are
clear.
Figure 35: Electrical connections for top segment to lower segment
Johnson Controls
Section 3 - Handling, storage, and installation
Multiple single flat plate for top/bottom
segment field assembly
Note: The top tier is shipped with the angled style of
brackets for shipping purposes. Remove these
brackets before installation.
Figure 34: Angled brackets for shipping
3. Carefully place each section of the top tier with-
out disturbing the gaskets on the bottom tier.
4. Secure the top tier to the bottom tier using the
self-tapping screws provided.
5. Install the corner connector hole plugs (P/N 021-
19568-000) as shown below onto the bottom race-
way corners.
3
31

Advertisement

Table of Contents
loading

Table of Contents