Field Installed Piping - York MCH CRAH Installation And Assembly Manual

Air handling units
Hide thumbs Also See for MCH CRAH:
Table of Contents

Advertisement

Form CRAH102.20-N1
Issue date: 03/11/2024

Field installed piping

Piping can shift during shipping. If necessary, the field
user can adjust the vertical piping brackets using the
slotted screws and added holes to achieve alignment.
See Figure 20 on page 25.
The Gruvlok or Victaulic fitting may
require loosening to achieve alignment
in some cases.
Figure 20: Piping brackets with slotted screws and added holes
Johnson Controls
Section 3 - Handling, storage, and installation
Figure 19: Vertical piping arrangement
3
25

Advertisement

Table of Contents
loading

Table of Contents