Displaying Switchpack Definitions; Displaying Line Build-Out Definitions - Paradyne HOTWIRE 7924 User Manual

Standalone t1 hdsl termination unit
Hide thumbs Also See for HOTWIRE 7924:
Table of Contents

Advertisement

Displaying Switchpack Definitions

Displaying Line Build-Out Definitions

7924-A2-GB20-20
3. Place the switchpack in the correct position for each desired configuration
option. Definitions of switchpack positions are provided in Appendix C,
Switchpacks and Jumpers
For example, to change a unit's card type from CO to CP, move switch 1 on
switchpack S1 to the OFF position.
4. Replace the enclosure cover and power up the board to reset and enable the
new configuration.
Enter 6 at the Config prompt to display the definition of each position in the
switchpack. Switchpack definitions are also listed in Appendix C,
and Jumpers
.
Config
6
Switch pack definition: (OFF=0, ON=1)
1
– CO/CP
2
– B8ZS
3
– Dual/Single Loop Mode
4
– Line Build Out Bit 0
5
– Line Build Out Bit 1
6
– Line Build Out Bit 2
7,8 – 00=Unframed, 01=D4
11=ESF
Config
Enter 7 at the Config prompt to display the switchpack and board settings for line
build-out. This information is useful if you need to change the line build-out
parameter manually. (Switchpack definitions are also listed in Appendix C,
Switchpacks and Jumpers
August 1997
Customizing DSX-1-Compatible Units
.
OFF=CP, ON=CO
OFF/ON
OFF=Dual, ON=Single
.)
Switchpacks
4-5

Advertisement

Table of Contents
loading

Table of Contents