Product-Related Documents
Paradyne documents are available on the World Wide Web at
www.paradyne.com. Select Library
Systems.
Refer to the following documents for information about the BitStorm 4800
IP DSLAM.
To order a paper copy of a Paradyne document:
T
T
Installation Overview
Installation of the POTS splitter card requires the following steps:
Be sure to register your warranty at www.paradyne.com/warranty.
2
Document Number
Document Title
4800-A2-GB20
BitStorm 4800 User's Guide
4800-A2-GN10
BitStorm 4800 Management Module Installation Instructions
4821-A2-GN20
BitStorm 4800 Installation Guide
Within the U.S.A., call 1-800-PARADYNE (1-800-727-2396)
Outside the U.S.A., call 1-727-530-8623
Determining the cables you need
Preparing the installation location and checking the package contents
Installing the POTS splitter chassis
Inserting the POTS splitter card(s) into the chassis
Connecting the cabling from the POTS splitter card connectors to the
BitStorm 4800, local loop, and in-building wiring
Securing the cables
July 2002
Technical Manuals
BitStorm DSL
6051-A2-GZ40-10