Advantech ASMB-927 Series User Manual page 4

Hide thumbs Also See for ASMB-927 Series:
Table of Contents

Advertisement

Initial Inspection
Before installing motherboard, please make sure that the following materials have
been shipped:
1 x ASMB-927 Startup Manual
1 x SATA data cable
1 x SATA power cable
2 x CPU power cables (8P)
2 x CPU carriers
1 x I/O port bracket
1 x M.2 screw
If any of these items are missing or damaged, contact distributor or sales representa-
tive immediately. We have carefully inspected the ASMB-927 mechanically and elec-
trically before shipment. It should be free of marks and scratches and in perfect
working order upon receipt. When unpacking the ASMB-927, check it for signs of
shipping damage. (For example, damaged box, scratches, dents, etc.) If it is dam-
aged or it fails to meet the specifications, notify our service department or local sales
representative immediately. Also notify the carrier. Retain the shipping carton and
packing material for inspection by the carrier. After inspection, we will make arrange-
ments to repair or replace the unit.
Order Information
Part Number
ASMB-927T2-00A1 C741
ASMB-927 User Manual
Chipset
Memory
16 x DDR5 RDIMM -/2
iv
GbE/10GbE LAN IPMI
Yes
Graphics
AST2600

Advertisement

Table of Contents
loading

Table of Contents