PIAGGIO MP3 530 hpe Service Station Manual page 194

Hide thumbs Also See for MP3 530 hpe:
Table of Contents

Advertisement

Machine Translated by Google
MP3 530 hpe
- Remove the counterweight.
- With the basket fixing screw in the middle
align.
- The fastening screw with the specified
tighten to the desired torque. The emp
Attach foaled product.
Suggested products
Loctite 243 Medium strength thread locking
sealant.
Colour blue
Torque guide values (N*m)
Counterweight screw 7 ÷ 8.5
- Remove the middle screw.
- Install the valve lifter mass. Care must be taken to ensure that the stop ring is correctly positioned
is attached.
- Lubricate the valve lifter compound and decompressor control pin.
- Install the return spring and approximately ¾
Tighten one revolution.
- Turn the engine and the marks as in
shown in the illustration upwards (end
suction phase).
- The valve lifter mass retaining bell
set.
- The fastening screw with the specified
tighten to the desired torque. The emp
Attach foaled product.
- Make sure the valve lifter mass is free
and is reset by the return spring.
ANNOTATION
THE ORIENTATION OF THE RESTRAINT BELL IS
GIVEN BY THE COUNTERWEIGHT FIXING SCREW.
Special tool
Motor
AGAINST - 197

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents