STATUS LED DESCRIPTION
2 345
2
3
1 - Soak Time counting indication
2 - Relay 1 Control O/P
3 - Relay 2 Control O/P
4 - Auto Tuning on indication
KEY OPERATION
FUNCTION
OPERATOR MODE
To enter in parameter setting
For start/stop PID auto tuning
To go in factory setting mode
To reset process after soak time end
PARAMETER SETTING MODE
To set parameter value and move to
the next parameter
To increment parameter value.
To decrement parameter value.
Set parameter to be save & exit.
SAFETY PRECAUTION
!
All safety related codifications, symbols and instructions that
appear in this operating manual or on the equipment must be
strictly followed to ensure the safety of the operating personnel
as well as the instrument.
If all the equipment is not handled in a manner specified by
the manufacturer, it might impair the protection provided by the
equipment.
Read complete instructions prior to installation
and operation of the unit.
WARNING : Risk of electric shock.
2500
4
PRESS KEY
+
For 3 sec
1. To prevent the risk of electric shock power supply to the
equipment must be kept OFF while doing the wiring
arrangement. Do not touch the terminals while power is
being supplied.
2. To reduce electro magnetic interference, use wire with
adequate rating and twists of the same of equal size shall
be made with shortest connection.
3. Cable used for connection to power source, must have a
cross section of 1mm or greater. These wires should have
insulations capacity made of at least 1.5kV.
4. A better anti-noise effect can be expected by using
standard power supply cable for the instrument.
1. This equipment, being built-in-type, normally becomes a
part of main control panel and in such case the terminals
do not remain accessible to the end user after installation
and internal wiring.
2. Do not allow pieces of metal, wire clippings, or fine
metallic fillings from installation to enter the product or
else it may lead to a safety hazard that may in turn
Press
endanger life or cause electrical shock to the operator.
6 sec
3. Circuit breaker or mains switch must be installed
between power source and supply terminal to facilitate
power 'ON' or 'OFF' function. However this mains switch
or circuit breaker must be installed at convenient place
normally accessible to the operator.
4. Use and store the instrument within the specified ambient
temperature and humidity ranges as mentioned in this
manual.
MECHANICAL INSTALLATION GUIDELINES
1. Prepare the panel cutout with proper dimensions as show
above.
2. Fit the unit into the panel with the help of clamp given.
3.The equipment in its installed state must not come in close
proximity to any heating source, caustic vapors, oils steam,
or other unwanted process by products.
4. Use the specified size of crimp terminal (M3.5 screws) to
wire the terminal block. Tightening the screws on the
terminal block using the tightening torque of the range of
1.2 N.m.
5. Do not connect anything to unused terminals.
1. The equipment should be cleaned regularly to avoid
blockage of ventilating parts.
2. Clean the equipment with a clean soft cloth. Do not use
isopropyl alcohol or any other cleaning agent.
3. Fusible resistor must not be replaced by operator.
WARNING GUIDELINES
WARNING : Risk of electric shock.
INSTALLATION GUIDELINES

MAINTENANCE

Page -2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UTC-4202 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents