Appendix 4: Installation Of Secondary Air Tubes And Baffle - Enerzone EB00025 Installation And Operation Manual

Table of Contents

Advertisement

Appendix 4: Installation of Secondary Air Tubes and Baffle

Destination 1.6 Installation and Operation Manual
1- Starting with the rear
tube, lean and insert the
right
end
of
secondary air tube into
the rear right channel
hole (DETAIL 1). Then
lift and insert the left end
of the tube into the rear
left channel.
2- Align the notch in the
left end of the tube with
the key of the left air
channel hole.
Using a
« Wise grip » hold the
tube and lock it in place
by turning the tube as
shown in (DETAIL 2).
Make sure the notch
reaches the end of the
key way.
3- Repeat step 1 and 2 for
the other secondary air
tubes.
4- To remove the tubes
use the above steps in
reverse order.
51
the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Destination 1.6

Table of Contents