Appendix 7: Installation Of Secondary Air Tubes And Baffle - Enerzone EB00002 Installation And Operation Manual

Us environmental protection agency phase ii certified wood stove
Table of Contents

Advertisement

Appendix 7: Installation of Secondary Air Tubes and Baffle

50
1- Remove the hatched bricks as per drawing.
2- Starting with the rear tube, lean and insert
the right end of the secondary air tube into
the rear right channel hole. Then lift and
insert the left end of the tube into the rear
left channel.
3- Align the notch in the left end of the tube
with the key of the left air channel hole.
Make sure the notch reaches the end of the
key way.
Solution 1.8 Installation and Operation Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solution 3.4Solution 1.8

Table of Contents