Download Print this page

Assa Abloy Corbin Russwin IN120 Installation Instructions Manual page 22

Advertisement

IN120 / IN220
FE6600/BL6600/MP6600 Series
Multi-point Lock
Installation Instructions
6
Installation Instructions (Continued)
l
Supplying Power to the Controller, continued
Important - before inserting PoE plug into PoE connector, apply
dielectric grease to top of plug, covering the pin area (Fig. 12a).
A. IN220 (PoE)
1. Once controller is securely in place, connect RJ45 male connector to fema-
le RJ45 port on controller board
(Fig. 12a).
2. If power is enabled, LED will flash and lock motor will cycle.
m
Inside Cover Installation
1. Assemble cover by hooking the top edge on the inside mounting plate, taking care
not to pinch gasket. The top edge goes between the plate and the gasket.
2. Carefully press the bottom of the cover toward the door without pinching any wires.
3. Secure the cover with a security allen wrench.
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2019-2021 ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole
or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
Fig. 11D
Fig. 11A
Apply grease
Fig. 10B
Fig. 11B
Security
Allen Screw
22
Fig. 11C
FM455 04/21

Advertisement

loading

This manual is also suitable for:

Corbin russwin in220