Download Print this page

Assa Abloy Corbin Russwin IN120 Installation Instructions Manual page 21

Advertisement

IN120 / IN220
FE6600/BL6600/MP6600 Series
Multi-point Lock
Installation Instructions
6
Installation Instructions (Continued)
k
Controller Installation, continued
1. Insert bottom tab of controller (ensure a clear path) into slot on mounting plate (Fig. 9D).
2. Align the board-to-board connectors (See Figure 9) by pivoting the controller toward the door
until the two tabs on top click securely into place on the mounting plate (Fig. 9E).
CAUTION: To avoid possible damage to board-to-board connectors, care should be taken
l
Supplying Power to the Controller
Important - before inserting PoE plug into PoE connector, apply
dielectric grease to top of plug, covering the pin area (Fig. 10A).
A. IN220 (PoE)
1. Once controller is securely in place, connect RJ45
male connector to female RJ45 port on controller
board (Fig. 10A).
2. If power is enabled, LED will flash and lock motor
will cycle.
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2019-2021 ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole
or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
when securing controller to the mounting plate. If there is resistance when securing,
detach the controller to determine the cause before re-attaching controller.
Fig. 11A
Fig. 9D
Click
into
place
Fig. 11B
Apply grease
Fig. 10A
21
Fig. 9E
FM455 04/21

Advertisement

loading

This manual is also suitable for:

Corbin russwin in220