Speakerphone Installation

Installation of IP Faceplate Speakerphone - If not previously installed from the factory, your
IP Faceplate Speakerphone should appear as displayed in the photo below. Once connected,
it needs to be secured to the CB 1-w tower using the 6 countersunk security screws and
security bit included with the unit. See LS1000 VoIP Speakerphone Admin Guide for
programming details.

Pre-Installed Components

Solar Power Controller - All of the wires connected to the solar power controller are pre-
installed at the factory as shown in the photo below, located behind the upper access door
of the tower. Note the 3 circuit breakers are OFF.
wires connected. Turn the Battery circuit breaker on first, then the Panel, then the Load.
Cellular Communication Components - If your unit was ordered with 4G/5G/LTE Cellular
Communication, the components required to operate this system are pre-installed at the
factory as shown in the photo below located behind the upper access door of the tower.
Please note, service need to be activated upon install by contacting Code Blue Tech
Support.
Cellular Communication
Equipment
Code Blue
259 Hedcor Street
Holland, MI 49423 USA
800.205.7186
CB 1-w Solar Tower
Once the batteries are installed and all
Solar Power
Controller
www.codeblue.com
Admin Guide
page 32 of 53
GU-168-E

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CB 1-w and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Entm06Entm07Cb 1-w solar tower

Table of Contents