Tower Installation

IMPORTANT
The following list is provided as a checklist for items required prior to installation or items
that will be required on installation site:
1.
Batteries must be FULLY bench charged before installation.
2.
A local cellular dealer must provide a SIM card before unit can place calls.
3.
Hand/Powered tools, including torque wrench, truck or mechanical lift for the CB 1
unit.
4.
At least two persons and ladders for attaching support collar, adjusting solar panel,
etc.
FOUNDATION - (see Anchor Bolt Installation Instructions on page 10)

SET THE UNIT -

Screw one set of nuts and washers onto the anchor bolts – After the foundation has
set, screw one set of nuts followed by one set of washers onto the anchor bolts. Set
the nuts so the lowest washer is about 2½ inches above the concrete and at an even
height. To accomplish this, use a small level and check from front to back, side to
side and diagonally. These nuts are NOT adjustable after the unit is in place. The
bottom edge of the Code Blue unit will be ½-inch above the concrete when installed.
IMPORTANT:
error in the adjustment of these will be magnified after installation.
IMPORTANT:
unit. Moisture problems may result if this condition is not complied with.
Set the Code Blue unit on the anchor bolts – Align the phone plate in the desired
direction and lift the Code Blue unit over the anchor bolts. The unit may be lifted
using the bracket on the inside of the unit. Note that the unit weighs approximately
330 pounds. Use appropriate lifting materials and methods to avoid possible injury
and/or damage.
Secure the Code Blue unit – Access the mounting studs through the door on the side
of the unit. Place the second washer, then nut and tighten the mounting nuts onto
the anchor bolts. This may be more convenient if a long socket, extension and
universal joint is used to tighten the hardware.
Code Blue
259 Hedcor Street
The leveling of the bottom nuts is crucial to the leveling of the unit. A small
A ½-inch minimum air gap is required between the foundation and the
Holland, MI 49423 USA
800.205.7186
CB 1-w Solar Tower
www.codeblue.com
Admin Guide
page 15 of 53
GU-168-E

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CB 1-w and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Entm06Entm07Cb 1-w solar tower

Table of Contents