CB 1-w Solar Tower
Admin Guide
Solar Power Installation (continued)
Attach battery hoist strap to first battery – Attach the battery hoist strap to the first
battery to be installed, & fish the remaining strap through the access door opening &
out the speakerphone faceplate opening.
Hoist the first battery into position – With the help of a second person, hoist the
battery through the access door & lower it down into position onto the battery shelf
plate. It is recommended that the battery terminals face the access door opening to
provide easy maintenance & service to the batteries in the future.
(Continued on next page)
Code Blue
•
259 Hedcor Street
•
Holland, MI 49423 USA
•
800.205.7186
•
www.codeblue.com
page 30 of 53
GU-168-E
Need help?
Do you have a question about the CB 1-w and is the answer not in the manual?
Questions and answers