1.1 Recommended tools and torque

Installation Guide ● PowerShaper 2.0
8
W
Wrench
PZ2
Pozidriv screwdriver
Flat
Flat screwdriver
T-W
Torque wrench
T-PZ2
Torque Pozidriv screwdriver
Type & Size
Terminal block (WDU2.5, WPE2.5, WSI4)
T1
AC Mains input terminals (6-25mm
T2
AC Mains input terminals (35-95mm
T3
Polarium batteries (DC cables)
M5 self tapping screw
T4
T5
M6 self tapping screw
M8 hex screws
T6
M10 hex screw
T7
Tool
Torque
0,4Nm
2
)
12,0Nm
2
)
22,0Nm
15Nm
5,7Nm
9,8Nm
24,0Nm
47,0Nm