Installing It/Tt (230Vac) Distribution - Pixii PowerShaper 2.0 Installation Manual

Grid tied energy storage system
Table of Contents

Advertisement

7. Disconnect PE cable (-CHASSIS) from bottom of terminal -X2:2.
8. Release and remove distribution kit panel by loosing 4x M6 torx screws. from MX trip.
7.
Figure 4.9 Disconnecting PE cable from

4.3.2 Installing IT/TT (230Vac) distribution

NOTE:
All cables/wires are marked with terminal name and connection point number to avoid wrong
connection. Use correct torque depending on terminal type.
1. Insert distribution into system and fix it with 4x M6 torx screws.
2. Connect PE cable (-CHASSIS) to chassis.
3. Connect PE cable (-FA1:PE) to bottom of SPD -FA1.
1.
Figure 4.11 Mounting distribution kit
panel
Installation Guide ● PowerShaper 2.0
-X2:2
2.
Figure 4.12 Connecting PE cable to
chassis
8.
Figure 4.10 Removing distribution kit
panel
3.
Figure 4.13 Connecting PE cable to
SPD -FA1
Electrical installation
27

Advertisement

Table of Contents
loading

Table of Contents