4.14 Cable glands

Make a small hole into the membrane using a
screwdriver or cut the top of the cone using side
cutter.

4.15 System label

Pixii system is marked with 2 system labels. One label is located on the outside of the cabinet (right hand
side seen from the front), and one is located inside the cabinet on the cabinet door. After connecting
system to AC network, type of network needs to be clearly marked on both labels. Use permanent
marker to do this. If system is connected to TN-S network, mark two red squares, in case of IT/TT
network mark two blue squares.

4.16 Finalization

After successful installation, mount plastic cover back following steps in chapter
page 24 .
Installation Guide ● PowerShaper 2.0
Push the cable through the guide hole.
Figure 4.44 System label
Electrical installation
"4.1 Preparation" on
41