Siemens SICHARGE D Product Information page 86

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Installing the cable management
5.
Place the meander pin
meander pin faces upwards towards the rope loop.
6.
Join both parts of the cable clamp together. Ensure the correct fit of the meander pin and rope.
Figure 13
Screwing in the cable clamp
7.
Place the M4 nuts in the hex holes. Insert the M4x14 hexagon socket-head screws opposite the nuts. Carefully screw in the cable
clamp.
Allen key size 2.5 mm
The tightening torque is 3 Nm
86
in the rope loop and in the groove provided in the rope clamp. Make sure that the smooth side of the
Installation of the cable management system
A5E53160522-AA, 11/2023

Advertisement

Table of Contents
loading

Table of Contents