Installation - Project EV APEX-7.3 Instruction Manual

Table of Contents

Advertisement

Installation

Wall-Mounted Installation Method:
1. Open the package and mark 4 holes in the wall (φ 8 * 50mm).
2. Fit into the wall plug.
3. Attach the mounting backplate with screws to the mounting wall.
4. Attach the bracket to the charger.
5. Hang the charger into the mounting back plate and screw it.
6. Installation completed.
Note: Installation wall angle 90°±15, thickness > 50mm
1
4
Removing the Base Cover Plate to Change Colour
1. Using a flat-headed screwdriver, push in the tabs connecting the front plate to the
charging unit. There are 10 tabs in total, located in the red positions below.
8
2
5
3
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Apex-7sApex-7s-4gApex-7s-tApex-7s-t-4g

Table of Contents