Project EV Dual Wall Pro Earth User Manual

Project EV Dual Wall Pro Earth User Manual

Dual outlet wall ac charger

Advertisement

Quick Links

Dual Wall Pro Earth
User Manual
A Complete Guide From
Installation To Operation
EVA-07D-SE-W / EVA-22D-SE-W
EVA-07D-SE-W-C / EVA-22D-SE-W-C
Dual Outlet Wall AC Charger
User Manual
*Information correct as of 01/23

Advertisement

Table of Contents
loading

Summary of Contents for Project EV Dual Wall Pro Earth

  • Page 1 Dual Wall Pro Earth User Manual A Complete Guide From Installation To Operation EVA-07D-SE-W / EVA-22D-SE-W EVA-07D-SE-W-C / EVA-22D-SE-W-C Dual Outlet Wall AC Charger User Manual *Information correct as of 01/23...
  • Page 2 Dual Wall Pro Earth Disclaimer This user manual is copyrighted by Project EV. (Hereinafter referred to as “ATESS Power Technology”). No company or person may extract or copy part or all of this user manual without the written permission of ATESS Power Technology.
  • Page 3: Product Features

    TIME SHIFTING LOAD MANAGEMENT Project EV are proud to be one of the most competitively priced electric vehicle charge point manufacturers on the market, with a highly versatile range, we are positive Project EV can solve all your charging needs.
  • Page 4 Contents Dual Wall Pro Earth Disclaimer Product Features Product Description Specification EVD-07D-SE-W EVD-22D-SE-W Packaging List Installation Wall Mounted Pole Mounted CT Clamp Load Management Configuring a laptop for commissioning 14-15 Laptop Commissioning settings explained 16-18 Project EV Standard App Using the App...
  • Page 5: Product Description

    Product Description Dual Wall Pro Earth 1. LOGO 2. LCD display 3. Screen Selection 4. RFID reader 5. A/B status indicator 6. Emergency Stop Button 7. Socket Outlet 8. WIFI/4G Antenna 9. Cable Entry 10. Mounting Bracket...
  • Page 6: Specification

    Specification EVA-07D-SE-W / EVA-07D-SE-W-C Certification Input & Output Input Amps 63a Single Phase Input voltage 230V AC SA8000 Accredited Input frequency 50HZ OZEV Approved Output voltage 230V AC UKCA Max. output power 7KW per socket Max. output current 32A per socket Charging interface type IEC 62196-2, Type 2 Protection...
  • Page 7 Specification EVA-22D-SE-W / EVA-22D-SE-W-C Certification Input & Output Input Amps 63a Three Phase Input voltage 415V AC SA8000 Accredited Input frequency 50HZ OZEV Approved Output voltage 415V AC UKCA Max. output power 22KW per socket Max. output current 32A per socket Charging interface type IEC 62196-2, Type 2 Protection...
  • Page 8: Packaging List

    Packaging List Dual Wall Pro Earth Name Remark Charger User Manual Quality Certificate User Card ST6.3 x 40 Stainless steels hex-head self-drilling Fixed Bracket screws 12 x 46 Fixed Charger Plastic expansion plugs M6*16 Charger fixation Stainless steels hex-head self-drilling...
  • Page 9: Installation

    Installation Wall Mounted Mount on a Wall 1. Open the packaging, you’ll see a charge point, a mounting bracket, a user manual and a bag of mounting accessories. There is also an RFID card. 2. Remove the mounting bracket from the charge point, use it as a template to mark the position of the 10mm drill holes.
  • Page 10 Installation Wall Mounted 3.1.3 Put the charge point onto the bracket, and x it with the 2 screws at the bot the charge point. The installation is done. 3. Mount the charge point onto the bracket, and fix it with the 2 screws at the bottom of a charge point.
  • Page 11: Pole Mounted

    Installation Pole Mounted 3.2 Mount on a pole 3.2.1 Open the packaging of the pole, take out the pole and mounting accessories. Mount on a Pole 1. Open the packaging of the pole, take out the pole and mounting accessories. 3.2.2 The pole must be installed on a hard surface, concrete surface is recommended, 2.
  • Page 12 Installation Pole Mounted 4. Position the charge point on top of the mounting pole and secure with 4 screws, 2 from the box of the mounting pole and 2 from the charger (originally holding the wall bracket to the charger). This will secure the charger to the post and the wall mounting bracket is no longer needed.
  • Page 13 Installation Modbus Meter To monitor the real-time power import and export, a CT clamp is needed for this function to work properly. The CT Clamp is needed to operate and use, both solar and dynamic load balancing only. Note: CT Clamp wiring can be extended up to 50m using Cat5e cable.
  • Page 14: Load Management

    Load Management Dual Wall Pro Earth Dynamic Load Management d. Some routers have 2 WiFi signals, one is 2.4GHz, the other is 5GH use the 5GHz WiFi as their default WiFi but the charger can only con WiFi. So if the charger can connect to your mobile phone hotspot, b...
  • Page 15 Configuring a laptop for commissioning Setting the laptop for a static IP. 7.4 Cannot access parameter setting page 4GHz nect a. Check if you have connected the charger to your computer, e the The Charger’s default IP address is 192.168.1.5. To access the parameter setting interface, b.
  • Page 16 Configuring a laptop for commissioning c. Chec Chrom d. Chec addres e. You f. If you can res 4. Select Internet Protocol Version 4 (TCP/IPV4) and click on properties. (4). Select Internet Protocol Version 4 (TCP/IPv4) and click on Properties. Then y 5.
  • Page 17 Laptop commissioning settings explained Connect the charger to a computer via a network cable. Open the web browser and type in 192.168.1.5:8080 in the address field and click enter, then the parameter setting page of the charger will open up. Parameter setting can only be done via web browser on a computer.
  • Page 18 2. Charger ID: this is the unique identification of the Charger. If the charger is to be connected to Project EV back-office server, this ID must be set as the serial number on the nameplate of the Charger. Otherwise the Charger cannot be registered on the server.
  • Page 19 40. Plug + charge allowed charge window 41. Heartbeat signal sent to the server (time in seconds) 42. Password required by some sim cards that are not Project EV. 43. Time out (in seconds) for starting charge without plugging in a vehicle 44.
  • Page 20: Using The App

    Introduction to the Project EV Standard App Description The Project EV Standard App is an app for controlling your charger. It can help you quickly and easily charge your vehicle with your charger. Main Functions Of Project EV Standard App (1) The user can add a charger by entering the chargepoint serial number and scanning the QR code.
  • Page 21: Creating A New Account

    field. Once all the fields have been completed, read and tick the user agreement before pressing register. Installer details are used by Project EV to give assistance to installers, and to contact them should an issue be raised. This could be installation based and not charger hardware issues.
  • Page 22: Commissioning Process

    Project EV Standard App Commissioning Process APP Commission 1. Download Project EV App. 2. Create user account 3. Add charger to serial number on the account. 4. Power charger up from the fuseboard – (This will emit hotspot for 1-2 minutes from when unit is powered on to allow user to get back to charger) 5.
  • Page 23 • People at their place of work including fleet drivers at most depots At Project EV, we would like to highlight and put your mind at ease that all of our charge points comply with these new standards and have been designed to protect both the stability of the electricity grid and our consumers.
  • Page 24 EV Smart Charge Points Regulations How to opt out of the peak charging hours To opt out, there are two ways to do this. The first way is to plug into the unit with a laptop and change setting 22 + 47 to 0. This will disable the pause in charging in peak hours. The second way is once the unit is available on the app, go into the settings, into EV smart regulations and select the slider to the left.
  • Page 25 EV Smart Charge Points Regulations How to opt out / adjust time delay You can opt out/adjust the time delay on setting 28 when configuring with a laptop. However, similar to the peak hours settings, this can also be done via the app.
  • Page 26 Project EV Standard App App Status Car Fully Schedule Charger Charged Charge Set Faulted Charger Car Charging Plugged In Offline...
  • Page 27 App for reservation and payment provided that the back office server supports such functions. If you are using the Project EV App, charging can be stopped by pressing the on/off button on the App. Always ensure you plug charger in vehicle, then charger before using App or RFID.
  • Page 28 Project EV Standard App Charger Control Methods RFID Mode: Always plug in vehicle then charger- then tap RFID Charging can only be initiated or ceased by swiping RFID card. Plug & Charge: Charging will start automatically after EV plugged in. If you want to stop the charging , just...
  • Page 29 Project EV Standard App Scheduling a charge When the chargepoint status is preparing, the user can use the preset charging scheme and the reserved charging function by selecting Pre-Set charging. When charging, the preset charging scheme, the amount of charge, the amount of consumption, the duration of charging, the charging rate, and the current voltage are displayed.
  • Page 30 Project EV Standard App Scheduling a charge You can also schedule a charge start time and set whether it will take effect every day. For example, if you want to start charging at 00:30 every day, if the vehicle is connected to the chargepoint, charging will start automatically.
  • Page 31 Project EV Standard App Making your unit bespoke On the setting page, the user can view the charging station ID, and the version number (not modifiable) in charger information: Parameter settings You can set the charger parameters by parameter setting.
  • Page 32 Project EV Standard App Making your unit bespoke Charging Record Press 'Records' found in charger settings to view past charge records, this will include charger ID, Gun A or B, Time, Energy, Cost and many other great details to help you keep...
  • Page 33: Account Management

    Account Management Add charger When you use Project EV for the first time, you need to add the charger in the APP to set up and control it. The process of adding a charger is as follows: Click ‘Add’ to add a charger by scanning the code or entering the charger ID.
  • Page 34 Project EV Standard App Account Management Authorisation management To manage authorised users, you can view the authorisation time, account name, and delete user in the authorisation management interface. Users can authorise other users to use a charging station through authorisation management. Enter the user name to authorise other users to use the chargepoint.
  • Page 35 Project EV Standard App Account Management Forgotten Password For a forgotten password, go to the login page, click “forgot password” button, and follow the instructions.
  • Page 36: Troubleshooting

    Troubleshooting Dual Wall Pro Earth Troubleshoot by LED behaviour or LCD display If fault occurs, users can check the fault information on the LCD or by the number of blinks of the LED indicator light. Each fault is indicated with a sequence of different numbers of LCD blinking.
  • Page 37 Troubleshooting Dual Wall Pro Earth No Connection: App shows unavailable On the Wi-Fi module (blue band), is there 1 or 2 blue lights? 1 Light: Check Wi-Fi details entered correctly and Wi-Fi is available at charge point location. 2 Lights- Check charger is not still connected to phone + check firewall problems.
  • Page 38 Troubleshooting Dual Wall Pro Earth Charging Issues If charging cannot start after the car is plugged in a. Check if the red emergency stop button is pressed. . b. Check what charge mode is being used APP/RFID- Charge can only be started/stopped by APP or RFID card, and the charger must be connected to the back office server already.
  • Page 39: Further Support

    Give us a call: 0800 599 9582 Choose options > Project EV (1) > Technical Support (2) In the unlikely event that no one is available to answer immediately, you will be placed into a que for 2 minutes. If the que time is exceeded, the call will be put through to a receptionist who will take a message and someone from technical will get back to you as soon as possible.
  • Page 40: Warranty

    Welcome to Project EV and ATESS, and thanks for choosing our Electric Vehicle charge point. All our products are backed by a 5-year warranty (3-years parts and labour plus 2 years parts) giving you years of trouble-free charging.
  • Page 41 Warranty Dual Wall Pro Earth Claims under the warranty can only be accepted if the buyer can provide the proof that the malfunctioning or non-conformity of ATESS Products results exclusively from defects in materials and/or workmanship under normal application, installation, and use and service conditions.
  • Page 42 Warranty Dual Wall Pro Earth 4. General Conditions for Warranty Claims A. The direct customers who have obtained the ATESS Products shall register the ATESS Products and upload the information within 30 days from the date of receiving the ATESS Products. If the customers fail to register the product before the deadline, the Limited Product Warranty will remain at 3 years.
  • Page 43 Warranty Dual Wall Pro Earth 5. Dispute regarding a material defect or a reduced power In case of a dispute regarding the existence of a material defect or reduced power in a warranty claim, ATESS will accept the judgment of an accredited testing institute (which is to be selected by ATESS in advance.) The cost and expenses for the testing shall remain with the Buyer if it is found to be good...
  • Page 44 Project EV, DC Fast Chargers deliver the fastest EV charging rate currently available. The DC Fast Charger is perfect for high-traffic commercial locations, fleets installations, gas stations, and at locations along major transportation corridors.
  • Page 45 Project EV team directly. I need help setting Reserved Charging in order to take advantage of off-peak energy tariff Please check our YouTube channel to watch our tutorials, support site or contact the Project EV team directly.
  • Page 46: Social Media

    Social Media FOLLOW US ON @projectevuk SOCIAL MEDIA @weareprojectev @projectev...
  • Page 47 THE FUTURE OF EV CHARGING EVA-07D-SE-W / EVA-22D-SE-W EVA-07D-SE-W-C / EVA-22D-SE-W-C...
  • Page 48 Project EV, enquiries@projectev.co.uk Unit 1 Lakes Court, 0800 599 9582 Lancaster Park, Newborough Road, Burton-On-Trent DE13 9PD www.projectev.co.uk *Information correct as of 01/23...

This manual is also suitable for:

Eva-07d-se-wEva-22d-se-wEva-07d-se-w-cEva-22d-se-w-c