Software
2 Software
2.1 Connecting the DMD EVM to the DLPC4430EVM
Before connecting a DLP EVM to the DLPC4420AEVM, identify the male connector on the back of the DMD
EVM.
The connectors are keyed by design and must follow an orientation to mate with the female connector (J63)
located on the DLPC4430EVM.
The EVM needs to look like
DLP650NEEVM and the DLPC4430EVM. The process is the same for use with the other DMDs seen in .

2.2 Quick Start

This section details a quick start guide on how to:
Download the associated software
Connect a DMD EVM to the DLPC4430EVM
Power up the DLPC4430EVM
Program the DLPC4430EVM to display a SPLASH image on the DMD
Troubleshoot issues
2.2.1 Downloading the Software
Before programming the DLPC4430EVM, make sure the DLPC44xx GUI and DMD firmware have both been
downloaded to the PC. The DLPC44xx GUI allows for operation of the EVM and the DMD firmware is required
according to DMD being utilized. If the DLP650NEEVM is being used, then the DLP650NE firmware is needed.
The DMD firmware and DLPC44xx GUI can be found under the Software Development tab of the product pages
on TI.com. To get started, these are the product pages for the DLP780NE, DLP800RE, DLP470NE, DLP480RE,
DLP550HE, DLP550JE, DLP650LE, DLP650NE, DLP670RE, and the DLPC4430.
6
DLP
®
Display ≥0.47-in Array WUXGA/1080p/WXGA/XGA/SVGA Evaluation
Module
Figure 2-1
after the FMC cables have been properly connected between the
Figure 2-1. EVMs Connected
Copyright © 2023 Texas Instruments Incorporated
www.ti.com
DLPU127 – DECEMBER 2023
Submit Document Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLPC4430EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Dlpc4430

Table of Contents