Preliminary Kvp, Timer, And Load Check; Timer Check And Adjustment - GE AMX-II Service Manual

X-ray unit
Table of Contents

Advertisement

GENERAL ELECTRIC
MEDICAL SYSTEMS
AMX-il X-RAY UNIT
8-3179
SM A0654E
SECTION 12.
PRELIMINARY KVP, TIMER, AND LOAD CHECKS
Initial Conditions:
a.
Circuit breaker and keyed switch OFF.
=
b.
Tube unit shielded and x-ray port blocked
(from Section 10).
НН
|
Hi
i
c.
H. V. Divider connected (from Section 10).
il ply
1444
Instrumentation:
|
+
a.
Connect scope to H. V. Divider, refer to
I
Mustration 4-11-30.
A
Scope to be grounded through line cord
and scope ground connected to AMX-110
25282-P10
chassis. Use external trigger circuit per
,
iNustration 4-11-31. Or INT, DC, +.
ILLUSTRATION 411-33
b.
Digital voltmeter across battery voltage
Timer:
80 KVP, 10 MAS
(from Section 11).
У
=
20 KV/DIV
H
=
10 MS/DIV
_
Xray
tub
t
itored by 0-150 DCMA
TRIG
= Ext. Trigger Circuit or Int, DC, T
é
meter (from 'Section 11 or
Y
NOTE:
Deep discharge pulses as shown above
"
appear on scopes with faster writing rates.
12-1 Timer Check And Adjustment
Older scopes wil! appear as in Ill. 4-11-34.
1.
Turn circuit breaker and keyed switch ON.
+
4,82.
Select 80 KVP, 10 MAS. Make an exposure and
+
record exposure duration from scope waveform -
+
measure time interval at 75% of maximum
KVP
(60 KVP for a selected 80 KVP). See Ill. 4-11-33.
teto
ed eo
4,43.
Select 80 KVP, 100 MAS. Make another ex-
posure and note exposure duration on scope.
|
3
See (If. 4-11-34.
3
4.
Ifnecessary adjust 3A1R7 for exposure interval
|
|
?
|
|
|
within +/-2% of .10 second at 10 mAs and
21514P1Q
1.0 seconds at 100 mAs.
a
ILLUSTRATION 4-11-34
5.
Select 80 kVp, 1 mAs. Make another exposure
.
and only if necessary, adjust 3A1R9 for
Timer:
80 KVP, 100 MAS
exposure interval of 10 MS.
V
=
20KV/DIV
H
=
200 MS/DIV
A6.
Turn keyed switch and circuit breaker OFF.
TRIG
=
Ext. Trigger Circuit
411-29

Advertisement

Table of Contents
loading

Table of Contents