LCD Setting

After pressing and holding ENTER button for 3 seconds, the unit will enter setting mode. Press "UP" or "DOWN"
button to select setting programs. And then, press "ENTER" button to confirm the selection or ESC button to
exit.
Setting Programs:
Program
00
Exit setting mode
Output source priority:
01
To configure load power
source priority
Description
Selectable option
Escape
USB : Utility first (default)
SUB: Solar first
SBU priority
13
Utility will provide power to
the loads as first priority.
If Utility energy is
unavailable, solar energy
and battery provides power
the loads.
Solar energy provides
power to the loads as first
priority.
If solar energy is not
sufficient to power all
connected loads, utility
energy will supply power to
the loads at the same time.
Battery provides power to
the loads only when solar
and utility is not sufficient.
Solar energy provides
power to the loads as first
priority.
If solar energy is not
sufficient to power all
connected loads, battery
energy will supply power to
the loads at the same time.
Utility provides power to the
loads only when battery
voltage drops to either
low-level warning voltage or
the setting point in program
12 or solar and battery is
not sufficient.