Kodak OG-Plus3.24RM Installation & User Manual page 18

Solar off grid inverter
Table of Contents

Advertisement

Setting voltage point back
to battery mode when
selecting "SBU" (SBU
priority) or "SUB" (Solar
first) in program 01
13
Setting voltage point back
to battery mode when
selecting "SBU" (SBU
priority) or "SUB" (Solar
first) in program 01
Solar energy priority:
16
To configure solar energy
priority for battery and load
Default setting: 46.0V
If "WECO battery" is selected in program 05
Default setting: 10%
Available options for 24V:
Battery fully charged
27V (default)
Available options for 48V:
Battery fully charged
54.0V (default)
If "WECO battery" is selected in program 5
15%
SbL: Solar energy for battery
first
UCB: Allow utility to charge
battery (Default)
16
The setting range is from
44.0V to 57.0V and
increment of each click is
1.0V.
The parameter will be fixed
at 10% SOC of battery.
The setting range is from
24.0V to 32.0V and
increment of each click is
1.0V.
The setting range is from
48.0V to 64.0V and
increment of each click is
1.0V.
This parameter will refer to
the SOC of battery and
adjustable from 15 to
100%. Increment of each
click is 5%. 15% is default
setting.
Solar energy charges
battery first and allow the
utility to charge battery.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Og-plus 3.48rmOg-plus 5.48rm

Table of Contents