Installation; Unpacking And Inspection - Kodak OG-Plus3.24RM Installation & User Manual

Solar off grid inverter
Table of Contents

Advertisement

INSTALLATION

Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should
have received the following items inside of package:
 The unit x 1
 User manual x 1
 Communication cable x 1
 Software CD x 1
 Parallel cable x 2
Installation
Consider the following points before selecting where to install:
Do not mount the inverter on flammable construction materials.
Mount on a solid surface
Install this inverter at eye level in order to allow the LCD display to be read at all times.
The ambient temperature should be between 0°C and 40°C to ensure optimal operation.
Rack Mounting
Please follow the diagram below to install the Inverter module in a 19-inch bay at the desired height in the
upright cabinet. Secure the device adequately and fix it to the cabinet with six screws.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Og-plus 3.48rmOg-plus 5.48rm

Table of Contents