Kodak OG-Plus3.24RM Installation & User Manual page 51

Solar off grid inverter
Table of Contents

Advertisement

3. Installation and Operation
PYLONTECH
After configuration, please install LCD panel with inverter and Lithium battery with the following steps.
Step 1. Use custom-made RJ45 cable to connect inverter and Lithium battery.
Note for parallel system:
1. Only support common battery installation.
2. Use custom-made RJ45 cable to connect any inverter (no need to connect to a specific inverter) and
Lithium battery. Simply set this inverter battery type to "PYL" in LCD program 5. Others should be "USE".
Step 2. Switch on Lithium battery.
Step 3. Press more than three seconds to start Lithium battery, power output ready.
Step 4. Turn on the inverter.
Step 5. Be sure to select battery type as "PYL" in LCD program 5.
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Og-plus 3.48rmOg-plus 5.48rm

Table of Contents