Operation
48
Delay start
The start of a programme can be delayed, for example, to benefit
from economy rates of electricity at night. The delay start period can
be set to the exact minute.
If soiling is left to dry on the load for longer, the reprocessing result
can be adversely affected. There is also a higher risk of corrosion
for stainless-steel load items.
To configure a delay start, select the button in the footer.
Start time
Enter the
confirm.
The reprocessing programme starts automatically at the set time.
The automatic programme start can be cancelled at any time. To do
this, press the button in the footer. A confirmation prompt is dis-
played: .
Cancel delay start?
confirmed, the reprocessing programme can be started manually.
with the on-screen keyboard and press OK to
Once the confirmation prompt has been