Figure 4.13 Input Wiring Position - Ford PRO FPC-AC0080ZC-U Series Installation Manual

Electric vehicle charging station
Table of Contents

Advertisement

80A Charging Station Series 2
Step 9.
Fasten the copper wire on the corresponding terminal block. The wiring
instruction is printed in front of the terminal block (L1/L2/G).
Step 10.
Use the following torque to connect the wire to the terminal block.
Screw
Hex 3/16
WARNING RISK OF FIRE OR EXPLOSION
Maximum Charger Current Setpoint* 80A
Recommended (Typical) Circuit
Breaker Rating

Figure 4.13 Input Wiring Position

AWG
2~6
8
10~14
To reduce the risk of fire, connect only to a circuit provided with the
required branch circuit overcurrent protection in accordance with the
National Electrical Code, ANSI/NFPA 70, and the Canadian Electrical
Code, Part I, C22.2.
100A 80A 60A
L1 L1
L2
L2
108.3 kgf-cm
46.1 kgf-cm
40.3 kgf-cm
64A
48A
40A
50A
24
Installation Manual
Torque
94 lbf·in
40 lbf·in
35 lbf·in
32A
24A
16A
40A
30A
20A
12A
15A

Advertisement

Table of Contents
loading

Table of Contents