Truss Bridge Assembly
Compatibility with Tubular track elevated trestles
T
o make the bridge compatible with Tubular O or O27 elevated trestles (available separately,
6-12755) stack the bridge piers as follows:
1. Track mounting top pier half (top)
2. Bridge mounting top pier half (top)
3. Tubular track elevated trestle section (middle)
4. Pier Base (on bottom)
3.
4.
Figure 3. Stacking the piers for use with tubular track trestles
Repeat this pier stack to create two piers of equal height. To mate tubular track to the bridge
piers use two FasTrack transition tracks (6-12040 FasTrack Transition Piece, sold separately).
Insert the FasTrack end of the transition track to the track mating pier. Tie the tubular track
into the tubular track end.
Track mounting top
pier half
1.
Figure 4. Transitioning the bridge for tubular track
2.
1.
FasTrack transition track
(available separately, 6-12040)
Elevated Trestle
(available separately, 6-12755)
6
Tubular track trestle
(available separately,
6-12755)
Tubular track