NOTICE
In order to minimize interference risks, the following requirements shall apply:
• Cables shielding & grounding:
All interconnect cables to peripheral devices must be shielded and properly
grounded. Use of cables not properly shielded and grounded may result in the
equipment causing radio frequency interference.
• Power supply distribution panel & power line:
The Innova system is predominantly intended for use (e.g. in hospitals) with a
dedicated supply system, and with an X–Ray shielded room.
• Subsystems, options & accessories Power supply distribution:
All components, accessories subsystems, systems which are electrically
connected to the Innova system, have to be all AC power supplied by the same
power distribution panel & line.
NOTE
• Stacked components & equipment:
The Innova system should not be used adjacent to or stacked with other
equipment; if adjacent or stacked use is necessary, the Innova system should
be observed to verify normal operation in the configuration in which it will be
used.
• Low frequency magnetic field:
In case of an Innova system, the Gantry (digital detector) shall be apart
1 meter from the X-Ray generator cabinet, 1 meter from the PDU cabinet, 3
meters from the UPS cabinet, and 1 meter apart from monitors. These
distances specifications shall minimize the low frequency magnetic field
interference risk.
• Electrostatic discharges environment & recommendations:
• In order to reduce electrostatic discharge interference, install a charge
dissipative floor material to avoid electrostatic charge buildup.
• The relative humidity shall be at least 30 percent.
• The dissipative material shall be connected to the system ground reference,
if applicable.
5750182-1EN 3
In order to avoid interferences, the same AC power distribution
panel should supply all Innova system components, accessories,
subsystems and options as the Advantage Workstation, and the
UPS. That same AC power distribution panel should be supplied by
a separated AC power line (coming from a separated transformer
line and winding).