GE Innova IGS 6 Preinstallation Manual page 121

Table of Contents

Advertisement

Equipment Requirements
Reference
For additional details on ceiling requirements for stationary rails, refer to:
• Direction 46–019639, Advantx (VHLA) XT Stationary Rails Installation and Adjustment.
• Direction 2393190-100, Pre-Installation Manual for LCD Monitor Suspension with 4, 6, or 8 monitors.
Rail Mounting
Attach stationary rails to structural steel with through-bolts in concrete ceilings. Do not use screw
anchors in direct tension.
Mount stationary rails directly to the ceiling slab or to flush–mounted unistrut or halfen structure. In
higher rooms with false ceiling, mount stationary rails to rigid vertical members hung from ceiling slab.
Securing a supplementary channel to the bottom of the vertical members and mounting the stationary
rails to this channel can greatly reduce the number of vertical members.
The stationary rail support structure must be leveled before installation can begin. Do not assume that
any support structure is level within specified tolerances, particularly after removing suspensions from
an existing room.
Bolt Specifications
• The maximum load per bolt will not exceed 350 lbs (1557 N).
• Each bolt must not "pull out" or otherwise fail under a vertically downward dead load of 1400 lbs (6228
N).
Rails selection
Monitor suspension rails in different lengths can be selected. Please refer to the GTC or contact the GE
representative.
Third Party Monitor suspension (option)
Attention must be paid to the height of suspended elements of the third party suspension, collision must
be avoided with the gantry.
110
TM
Innova
IGS 6
5750182-1EN 3

Advertisement

Table of Contents
loading

Table of Contents