GE Innova IGS 620 Preinstallation Manual page 86

Table of Contents

Advertisement

Innova
IGS 620, Innova
IGS 630 Preinstallation Manual
TM
TM
Direction 5694389-1-1EN, Revision 2
Illustration 2-31: Fluoro UPS Cabinets (Optional) - UPS UL
The left, right or back side of the UPS cabinet can be positioned against the wall.
The front side of the UPS cabinet must be accessible for maintenance operation.
In front of the cabinet, the clear width of the service area to insure electrical safety shall be at
least 0.9 m. In cases where 2 cabinets are installed face to face (both sides of the access way),
the clear width shall be at least 1.2 m.
Recommended minimum clearance between ceiling and top of the UPS should be 400 mm (16")
for proper cooling air exhaust.
86
1 System Components

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova gs 630

Table of Contents