Innova Imaging System - GE Innova IGS 620 Preinstallation Manual

Table of Contents

Advertisement

Illustration 2-4: Coolix 4100 chillers (Frontal and Lateral) with autotransformer

1.2.6 Innova Imaging System

An Innova Frontal and Lateral System is managed and controlled by a System including:
Two C1 cabinets, inside which are located the RTAC, the DL, (DL in frontal C1 cabinet only),
the HUB, the KVM
C2 cabinet (frontal and lateral positioners)
VCIM console
Revolution Digital Detector mounted on frontal positioner
Revolution Digital Detector mounted on lateral positioner
Two external Digital Detector conditioners are mandatory
A 3kVA cabinet UPS to be installed close to PDB (Main Disconnect Panel) whether the
Fluoro UPS option is installed or not
LCD 19" EIZO GmbH SMD 19100G Color Monitor
LCD 19" EIZO GmbH SMD 19100G B&W Monitor
LCD 19" EIZO HB color monitor
LCD 58'' EIZO GmbH LS580W Color Flat Panel (LDM option)
Chapter 2 Equipment Requirements
Innova
IGS 620, Innova
TM
IGS 630 Preinstallation Manual
TM
Direction 5694389-1-1EN, Revision 2
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova gs 630

Table of Contents