GE Innova IGS 620 Preinstallation Manual page 127

Table of Contents

Advertisement

NOTE:
2285053 is kit for through bolts with water/electric separator.
All GE supplied vascular system floor preparation are contained in catalog. There are some
additional gantry/table mounting kits based on each mounting method: through bolts or floor
anchors.
Base plate assembly (mandatory) 2285048 – Refer to
If there is no integrated baseplate plan (2359194) delivered with S18101SG, please refer to
drawings 2359194
on this plan..
Assembly and separation (Select kit) 2285050 – Refer to tables,
On grade, Floor anchors – 2286398.
Through bolts and insert – 2285053.
Floor plate / Base plate Assembly – 2285632.
Templates (select kit) – 2285054 – Refer to
Angio/Cardio/Neuro templates – 2285056 (containing 2185979, 2127792 and 2360133
templates).
Chapter 2 Equipment Requirements
Innova
Illustration 2-60: Anchor kit choice
(Illustration
2-61). Please order locally the integrated base plate based
IGS 620, Innova
TM
TM
Direction 5694389-1-1EN, Revision 2
Table 2-12
Section 3.2.3.4
IGS 630 Preinstallation Manual
Section 3.2.3.3
127

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova gs 630

Table of Contents