GE Innova IGS 620 Preinstallation Manual page 131

Table of Contents

Advertisement

3.2.3.3.2 2285053 – Through bolts with insert (S18101SF)
Table 2-15:
Item
3.2.3.3.3 2285632 – Floor plate / Base plate assembly (S18101SG)
Table 2-16:
Item
NOTE:
The kit 2285632 Floor plate / Baseplate assembly is needed when the floor plate is
installed. This part isn't GE part. It's ordered locally.
Chapter 2 Equipment Requirements
Name
Part #
Bolt, Hex
2296892
Washer,
99142204
Flat
Plate
2290941
Nut, Hex
99141607
Grout assy
2285055
Dowel
2290937
Water Elec‐
2268647
tric Separa‐
tor
Name
Part #
Hex Screws 2360523
Washer
99125091
Hex Screws 99133570
Innova
IGS 620, Innova
TM
Description
Through Bolt; M20 - 500-400
12 bolts for Frontal Positioner and
4 bolts for Table
Special Flat Washer for Through
Bolts; one for each bolt
Special Steel Spacer Plate; 4 in. x
4 in. (102 mm x 102 mm); one for
each bolt
Hex Nut M20 STL galvanized two
for each bolt
- 10 kg Powdered Mortar Ardex
K-15
- RTV Silicon Rubber Adhesive
- 18 mm making tape adhesive
- Open cell foam
Wood Dowel; 24 mm diameter
Manufactured part introduced in
Positioner key hole to fit 1 electri‐
cal conduit of 6".
Description
Screw M16x30x30 Inox A4-80
Pass
Washer P 17 mm/40 mm
Screw M16x40x40 Inox A4-80
Pass
IGS 630 Preinstallation Manual
TM
Direction 5694389-1-1EN, Revision 2
Quan.
16 pc
Through Bolt mounting
method hardware
16 pc
same as above
16 pc
same as above
32 pc
same as above
1 kit
Used in constructing Fron‐
tal Positioner grout dam
12 pc
1 pc
Electrical and water con‐
duits separated inch size.
Quan.
12 pc
For floor plate / Base plate
assembly
34 pc
24 are used for the posi‐
tioner integration
10 pc
4 only are used for Omega
Notes
Notes
131

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova gs 630

Table of Contents